PURSUIT 3000 Offshore Specifications
Name: Change Order
Year Built: 2001
Length: 9.49m / feet
Beam: 3.65 / 11.98 feet
Sleeps: 4

PURSUIT 3000 Offshore

USD 84,900


General Description

The Pursuit 3000 Offshore is tournament-bred following the classic styling of the great Palm Beach designs. The generous 12-foot beam provides a wide-open cockpit to battle big game. The centerline helm comes complete with a tall pedestal seat, and two more to port and starboard. It has ample space for a full suite of electronics for extended offshore voyages, and gives the captain excellent visibility. Two cushioned fish / storage cooler boxes provide additional seating, while a highly functional bait prep center puts everything within reach, including a transom fish box with overboard drain, cutting board, tackle lockers, circulating livewell, and a sink with spray hose. The inviting cabin, detailed in teak and holly accents and finished in comtemporary fabric patterns, has the spaciousness to make family and guests feel right at home. The settee, featuring a high-gloss teak table with a hand-crafted inlaid marlin, is served by a functional galley with 110V stove, microwave, AC/DC refrigerator and plenty of storage. A large double berth forward, roomy settee, and pilot berths make overnight voyages a pleasure. With a hull design specifically created for performance, stability and a soft, dry ride, the 3000 Offshore is a reliable standard in the Pursuit line.

Request Details

Name *
Email *
Tel. *
Address
Message
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.